1. All new wiring, raceways, enclosures and boxes to be concealed by backfill, concrete, drywall, or other materials that will prevent a thorough inspection must be inspected before concealment.2. All wiring devices and equipment connections, including service equipment, must also be completed and inspected before they can be energized. Utility Service connections will not be authorized until this inspection is approved.
3. Once the installation is energized, a Final Inspection is required to confirm the installation is working properly. A Final inspection approval is required to close the permit. Failure to obtain a Final Inspection Approval will cause the permit to eventually expire.
Inspection request must be made in writing by the Permit Holder only. A inspection request form is available from the Development Services Administration’s Electrical Section. This form must be completed and signed by the Electrical Contractor or Permit Holder. Request are required to be submitted at least 24 hours before the inspection is needed, excluding weekends & County Holidays. After the inspection is conducted, the inspection results will be noted on the bottom of the request form and returned back to the Electrical Contractor.