Project Name
Kalana O Maui Fire Sprinkler – Phase 2
Project No. 15-24
Scope of Work
The work generally consists of installing new fire sprinklers on the 8th floor and modifying the existing fire sprinkler system for the 7th floor, indicated on the plans. Connect and Test installation to existing fire alarm system. Work includes, but are not limited to working on and around existing asbestos containing materials or hazardous materials; providing the proper safety training and equipment for hazardous materials; If hazardous materials are damaged or disturbed during construction, create containment and proper disposal of hazardous wastes and provide proper abatement and air quality tests.
(Project Map)
When
NTP: TBD
Contract Working Days: 120
Estimated Completion Date: TBD
Streets Involved
Kalana O Maui Building
Contractor
Royal Mechanical & Sheet Metal
4329 Laakea St.
Honolulu, HI 96818
(808) 779-6560
Contract Cost
$359,525.00
Project Contact
Department of Public Works
200 South High Street Suite 410
Engineering Division
(808) 270-7745