Old Haleakala Highway Sidewalk Improvements

Project Name

Old Haleaakala Highway Sidewalk Improvements
Project No. 19-15


Scope of Work

The project includes construction of approximately 2,425 LF of reinforced concrete sidewalk on the mauka side of Old Haleakala Highway from Mohala Street to Loha Street. The scope of work includes removal of obstructions; construction of intersection ramps; relocation of exiting water meters and standpipes; installation of storm drainage features; pavement striping; traffic sign installation; grade wall installation; and other incidental items.

Work days are from Monday to Friday except weekends and holidays. Hours of operation will be from 8:30 am to.3:00 pm. Lane shift is anticipated throughout the project duration providing one lane in each direction with some intermittent 5ne lane closures as the need arises.
(Project Map)

When

NTP:  April 4, 2022
Contract Working Days: 200
Estimated Completion Date:  Late January 2023

Streets Involved

Halaeakala Highway (Mohala St. to Loha St.)

Contractor

West Maui Construction LLC
305 E. Wakea Ave., Ste 100
Kahului, HI 96732
(808) 877-4202

Contract Cost

$1,962,628.00

Project Contact

Department of Public Works
200 South High Street Suite 410
Engineering Division
(808) 270-7745