Current & Future Projects
-
Guardrail and Shoulder Improvements - Phase 1
FAP No. STP-A371(003) Contractor: HI-Built Project Cost: 325,274.00 NTP: TBD Description: This project includes the installation of guardrail improvements and end treatments along Haliimaile Road.
Link to page -
Iolani/Liholani/Makani Rd. Pavement Reconstruction
FAP No. STP-0900(099) Contractor: Hi-Built LLC Project Cost: $12,242,245.00 NTP: TBD Description: This project includes roadway reconstruction, which includes removal of existing roadway asphalt concrete & Portland concrete and constructing new asphalt concrete pavement section for roadways, including segment of Portland Cement Concrete Pavement section; Intersection improvements, including striping and signage; removal and replacement of damaged and/or deteriorating drainage facilities; constructing concrete curbs, gutters, sidewalks and curb ramps; installing new roadway signs, striping and pavement markers; relocating existing signs; rehabilitation of existing twin-120” culverts along Liholani Street, including 8” shotcrete lining of existing CMP culverts, headwall repair and rehabilitation, protection of existing overhead power lines and appurtenances; masonry retaining walls; chainlink fences; and all other incidental work necessary to complete the project.
Link to page -
Kahana Nui Bridge Replacement
FAP No. BR-3080(009) Contractor: Hawaiian Dredging Construction Company Project Cost $4.798,000.00 NTP: TBD Description: The project includes demolition and removal of existing bridge structure footing and abutment walls, existing utilities, landscaping, and concrete curb and gutter, sidewalk and driveways; construction of new asphalt concrete pavement, new concrete gutter, utility improvements, new bridge structure, footing and abutment walls, driveways, sidewalk and curb ramps, signing and striping; and all other incidental work necessary to complete project.
Link to page -
Kaupakalua Road Pavement Reconstruction, Phase I
FAP No. STP-0365(010) Contractor: Hi-Built, LLC Project Cost: $5,112,322.43 NTP: 02/11/2019 Description: The project involves the removal of existing pavement down to the gravel subbase within the road right-of-way, installation of a new asphalt concrete pavement section with reinforcing geogrid, new rigid pavement (Portland Cement Concrete) section for a small portion of the roadway, installation of new pavement striping and markers, adjusting manhole/valves frames and covers where needed, removal/replacement of dented guardrails, removing/replacing signage and posts, and other incidental items.
Link to page -
Kaupakalua Road Pavement Reconstruction - Phase 2
FAP No. STP-0365(011) Contractor: Maui Paving LLC Project Cost: $5,718,862.80 NTP: 10/05/2020 Description: This project consists of the removal of existing pavement down to the gravel subbase within the road right-of-way, and installing a new asphalt concrete pavement section with reinforcing geogrid. The scope of work also includes installing new pavement striping and markers, replacement of existing water system, adjusting manhole/valves frames and covers where needed, removal/replacement of dented guardrails and removing/replacing signage and posts.
Link to page -
Old Haleakala Highway Traffic Signal Improvements
FAP No. STP-0367(001) Contractor: Paul's Electrical Contracting LLC Project Cost: $497,700.00 NTP: TBD Description: This project involves upgrading an existing traffic signal system to current standards. Construction work includes furnishing and installing new signal poles, vehicle signals, pedestrian signals, pullboxes, conduits, above-ground radar detection, preemption devices, controller assembly, electric meter; pavement striping and markers; removing/adding signage and posts; removal of existing hedge; and all other incidental work necessary to complete the project.
Link to page -
Central, South, and West Maui District Resurfacing
Project No. 20-10 Contractor: Maui Kupono Builders Project Cost: $1,420,956.00 NTP: TBD Description: This project involves cold planning and resurfacing of various roads in the Central, South, and West districts of Maui. The scope of work includes cold planing; road resurfacing; pavement striping and markers; adjustments of manholes and water valves; installation of signs; installation of curb ramps; replacement of a concrete thru gutter; and other incidental items.
Link to page -
East Maui District Resurfacing (FY 2019)
Project No. 19-19 Contractor: Maui Paving, LLC Project Cost: $443,111.00 NTP: TBD Description: The project involves cold planing and resurfacing Hana Highway from the south end of Haneoo Road in Hana to 1.1 mile south. The scope of work includes cold planing the existing pavement; road resurfacing; pavement striping and markers; adjustment of manholes and water valves; and other incidental items.
Link to page -
Elilani St. and Kilani Pl. Pavement Reconstruction
Project No. 19-09 Contractor: Maui Kupono Builders, LLC Contract Cost: $982,702.25 NTP: 06/08/2020 Description: The project involves reconstructing the roadway pavement of Elilani Street and Kilani Place, cold planing and resurfacing a portion of Elilani Street, and replacing three culverts on Elilani Street. The scope of work includes road resurfacing; road reconstruction work; culvert replacement; CRM headwall reconstruction, pavement striping and markers; adjustment of water valves; replacement of signs; and other incidental items.
Link to page -
Kahului Fire Station Sidewalk Improvements
Job No. 18-03 Contractor: Betsill Brother LLC Project Cost: $110,986.97 NTP: TBD Description: The project involves constructing a concrete curb and sidewalk along the Kahului Fire Station frontage, demolition of existing walls, grading, construction of grade walls, relocation of fire hydrants, and striping.
Link to page -
Kalana O' Maui Civil Defense HVAC
Project No. 19-47 Contractor: Bitsill Brother LLC Project Cost: $69,370.83 NTP: TBD Description: The work includes the furnishing of all labor, tools, materials, and equipment necessary to install an air conditioning systems for civic defense in Kalana O Maui building, Wailuku, Maui, Hawaii.
Link to page -
Kalana O' Maui Fire Sprinkler - Phase 2
Project No. 19-47 Contractor: Royal Mechanical & Sheet Metal Project Cost: $359,525.00 NTP: TBD Description: The work generally consists of installing new fire sprinklers on the 8th floor and modifying the existing fire sprinkler system for the 7th floor, indicated on the plans. Connect and Test installation to existing fire alarm system. Work includes, but are not limited to working on and around existing asbestos containing materials or hazardous materials; providing the proper safety training and equipment for hazardous materials; If hazardous materials are damaged or disturbed during construction, create containment and proper disposal of hazardous wastes and provide proper abatement and air quality tests.
Link to page -
Kalana Pakui AC Replacement
Project No. 18-26 Contractor: MEI Corporation Project Cost: $54,525.46 NTP: TBD Description: The work includes the furnishing of all labor, tools, materials, and equipment necessary to install a replacement air conditioning system for Kalana Pakui building, Wailuku, Hawaii.
Link to page -
Kalena Bridge Parapet Repair
Project No. 20-44 Contractor: West Maui Construction Project Cost: 19,373.00 NTP: TBD Description: This project is located in Kipahulu at approximately mile marker 40.75 and is to repair approximately 6-feet of Kalena Bridge's parapet wall. The scope of work consists of demolishing and removing the existing parapet wall, constructing a new reinforced concrete parapet wall, and installing new pavement as needed.
Link to page -
Kamehameha Avenue Street Light at Mahaolu Street
Project No.: 18-19 Contractor: HI-Built, LLC Project Cost: $39,215.00 NTP: TBD Description: The project involves installing a street light pole foundation, conduit, and pullbox, and replacement of concrete sidewalk.
Link to page -
Koukou'Ai Bridge Repair
Project No. 18-41 Contractor: West Maui Construction LLC Project Cost: $1,306,341.70 NTP: TBD Description: The project involves clearing of debris along the bridge railings and unclogging of deck drains; cold-planing & replacing the pavement section over the bridge deck; and repair of deteriorated concrete of the bridge deck, arch rib, arch columns, and other supporting members. Any bridge repairs shall be undertaken in-kind and in accordance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties.
Link to page -
Lahaina Aquatic Center Retention Basin Restoration
Project No. 19-50 Contractor: West Maui Construction Project Cost: $633,822.38 NTP: TBD Description: The project involves clearing, grubbing, removal and disposing of existing vegetation and debris from the Lahaina Aquatic Center Basin and the excavation and disposal of 18” of existing clay soil from the bottom of the basin and replacing it with screened sand, crushed rock gravel, and geotextile fabric.
Link to page -
Lanai District Resurfacing (FY 2018/2019)
Job No. 18-17 Contractor: Peterson Bros Project Cost: $419,669.80 NTP: TBD Description: The project involves cold planing and resurfacing Houston Street (from Third Street to Sixth Street), Houston Place, Palawai Street, and Eleventh Street; adjusting manholes and water valves; installing pavement striping and markers; and other incidental items.
Link to page -
Mahalawa Temporary Bridge
Project No. 19-32 Contractor: Goodfellow Bros, LLC Project Cost: $943,508.60 NTP: TBD Description: The project involves, but is not limited to, installing a temporary pre-engineered steel bridge over the existing Mahalawa Bridge, constructing A.C. paved ramps and guardrails at both roadway approaches to the temporary bridge, and temporary traffic control.
Link to page -
Molokai District Resurfacing (FY2020/2021)
Project No. 20-51 Contractor: Seal Pros, LLC Project Cost: $581,959.00 NTP: TBD Description: This project involves the reconstructing the pavement of various roads in Kalae, Molokai. The scope of work also involves pavement striping and markers; adjustment of manholes and water valves; installation of signs; and other incidental items.
Link to page -
Old Haleakala Highway Sidewalk Improvements
Project No. 19-15 Contractor: West Maui Construction Project Cost: $1,962,628.00 NTP: TBD Description: The project includes construction of approximately 2,425 LF of reinforced concrete sidewalk on the mauka side of Old Haleakala Highway from Mohala Street to Loha Street. The scope of work includes removal of obstructions; construction of intersection ramps; relocation of exiting water meters and standpipes; installation of storm drainage features; pavement striping; traffic sign installation; grade wall installation; and other incidental items.
Link to page -
Pukalani Terrace Subdivision Roadway Conditions
Job No. TBD Contractor: TBD Project Cost: TBD NTP: TBD Description: The County of Maui, Department of Public Works, recognizes the poor roadway conditions throughout the Pukalani Terrace Subdivision. Unfortunately, these roads have a poor quality material beneath the asphalt pavement which is not suitable to support a new pavement layer. Therefore, we are not able to simply repave the roads and instead complete pavement reconstruction is required throughout the subdivision. This expensive treatment reduces the length of roads that can be addressed per year.
Link to page -
Upcountry District Resurfacing (FY 2019)
Project No. 19-40 Contractor: Maui Paving, LLC Project Cost: $453,162.00 NTP: 10/05/2020 Description: The project involves cold planing and resurfacing various roads in Kula. The scope of work also includes adjusting water valves; pavement striping and markers; and other incidental items.
Link to page -
Waiehu Heights Drainline Replacement
Project No. 20-33 Constractor: Maui Kupono Builders Project Cost: $673,190.00 NTP: TBD Description: This project involves the replacement of existing drainlines on Wailupe Drive and Olena Street in the Waiehu Heights subdivision; installation of new drainage structures; installation of a reinforced concrete jacket over and existing sewerline; trench restoration; replacement of curb and gutter; pavement resurfacing; and other incidental items.
Link to page -
Wailea Alanui Drainline Repair at STA 50+35
Job No. 17-63 Contractor: Norrie Construction Project Cost: $571,201.00 NTP: 08/17/2020 Description: This project involves installing a cured-in-place lining at an existing drainline and installation of a new drain manhole on Wailea Alanui Drive.
Link to page